The city’s population is 206 000 people.
Water Treatment Station "Balakovo Vodokanal" supplies drinking water to the city. The station’s total capacity is 100 000 m3 of water per 24 hours. Water is supplied from the surface source (the
Volga river), is filtered and disinfected by liquid chlorine.
In January 2007 12 AQUACHLOR-500 devices with total oxidants producing
capacity (in chlorine equivalent) of 144 kg per 24 hours were installed
and put into operation.
AQUACHLORs provide disinfection of 23 000 m3 of water per 24 hours. The oxidants solution produced in AQUACHLOR devices is used for initial and second chlorination.
Winner of regional competition
Published 12.02.2008.
"Balakovo Vodokanal" rated first in the regional contest of 2007 as
a best housing and communal enterprise among water-supply and
wastewater treatment stations.
The enterprise could reach such results due to it’s activities
aimed at perfect satisfaction of needs of people, enterprises and
organizations in water-supply and wastewater treatment in the necessary
volume and of necessary quality.
Though It was planned to spend 21.6 million rubles in 2007 on major
repairs of facilities, however over 23 million rubles were spent on
this purpose. 2,9 km of water-supply lines of 100 to 500 mm in diameter
were replaced as well as 0,5 km of wastewater lines of 300 to 900 mm in
diameter.
In 2007 the enterprise has also won Contest of Investment
Projects realized in Saratov region which allowed to purchase AQUACHLOR
devices for drinking water disinfection with the help of 50% budgetary
co-financing.
These activities continued in 2008. In January 2008 an
agreement on granting of interest-free credit in the amount of 2
million rubles in the context of the regional target program "Energy
efficiency of Saratov region" was signed. The other 5 million rubles
are planned to be granted in February 2008 in the context of the
regional target program "Drinking water". These means will be used for
AQUACHLOR devices purchase.

12
AQUACHLOR-500 devices and brine preparation and storage tanks lay-out
in the room of 6 by 4,3 m (Water Treatment Station, Balakovo, 2007)

12 and 6 AQUACHLOR-500 devices, installed in adjacent rooms, provide a supply of oxidants mixture to the mixer # 1

ÐInstallation
of 12 AQUACHLOR-500 devices: assemblage of collector carriages Water
Treatment Station, Balakovo, 2006.
 |
 |
| 12
AQUACHLOR-500 devices, brine preparation and storage tanks,
hydrochloric acid tank are installed In the chlorination room of 6 by
4,3 m. (Water Treatment Station, Balakovo, 2007) |
In view of the fact that oxidants solution supply points (which
coincide with chlorine water supply points) are located practically at
the same height with AQUACHLOR-500 devices and are distant enough from
them , concentrated oxidants solution is supplied directly to the
chlorination ejector pumps. The obtained chlorine water is then
transported to supply points through the existing circuit.

Oxidants solution supply circuit, Balakovo WTS, 2007
3 manifolds, each for 4 AQUACHLOR devices |
Hydraulic connection of the 12 AQUACHLOR-500 devices to water
pressure line is carried out with the help of 3 manifolds each
connecting 4 AQ-500 devices. Each manifold is equipped with globe
valve, mechanical impurities filter, elector-magnetic valve and reducer
(WTS, Balakovo, 2007) |
Manifold for water supply to 4 AQUCHLOR-500 devices |
Pressure in water line till reducers should be not less than 2 bar/cm2, pressure set by reducer should ensure flow of 40-500 liters of water per hour through ejector mixer of AQUACHLOR-500.
In the launching period unrefined rock-salt was used, aqueous
solution of this salt was of dirty yellow color. AQUACHLOR-500 devices
had to be de-scaled once every 12 hours.
 |
 |
| Unrefined rock-salt and aqueous solution of rock-salt. |

19 AQUACHLOR-500 devices, installed in the building of former chlorination room and former storage of chlorine cylinders, provide a supply of oxidants mixture to the mixer # 2.
Salt of higher quality was used next which allowed to de-scale the
devices once per 24 hours. Usage of salt tablets allowed to de-scale
the devices once in 3 days.
 |
 |
| Salt of higher quality |

In
the end of 2007 10 more AQUACHLOR-500 devices, installed in the same
room, were added to the 9 operating devices. Water Treatment Station,
Balakovo, 2008.


Salt
storage and bunker for salt feeding to brine preparation tanks for 19
AQUACHLOR-500 devices. Water Treatment Station, Balakovo, 2008.