What are the requirements for installation and operation premises? Is planning needed?
AQUACHLOR can be stationed (without planning, installation and construction works) in the existing chlorination premises or in any heated premises equipped with combined extract and input ventilation with air change intensity not less than single volume of the premises per hour.
Space required for assemblage, operation and technical servicing of one AQUACHLOR-500 device should be not less than 7 square meters including space needed for brine and acid HCl (for reactor cleaning) preparation and supply unit.
Water pressure line (from 3 to 6 kgs/sm
2), sewer, power circuit of 220 W in the premises is obligatory.